what is difference between fluidity and workability also how
palsticizer works
Answer Posted / guest
FLUIDITY means the property of concrete to flow where as
Workability means the property of concrete with which it
can be mixed,transported,placed and compacted easily into
the required shape OF Structural member. Plasticzers
increase the workabilty as well as fluidity of concrete
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
Stringer How many cm goes to landind
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Is it possible to make a feature using an overdefined sketch?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
it is possiblee to produce concrete with out cracks...
What is need for setting limits?
how to calculate the strength of rebound hammer test reading in building construction ?
What is a tensile strength? What is the tensile strength of wood?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
What is the usage of zoom command?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Define What is rigging?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall