What is the maximum allowable 'Silt content' in River sand
Answer Posted / mohammed aijaz hussain
Maximum allowable silt content in river sand is 4%
| Is This Answer Correct ? | 9 Yes | 10 No |
Post New Answer View All Answers
Define What is made from large rocks, which protects the base of cliffs?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how much of the strength comes from post-production curing
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
What is difference between combin footing & rapt footing
Consumption of Binding wire for fixing of cover block in vertical surface
what is hydrostatic paradox?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how many tonnes equals to one cubic feet?
how do you stabilize a waterlogged area in road construction