How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / mohammed aijaz hussain
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 X 1 = 0.35 cu.m.
Cement required = 1/6 X 0.35 = 0.058 cu.m. = 1.67 Bags
Sand required = 5/6 X 0.35 = 0.292 cu.m.
Bricks required = 500 Nos.
| Is This Answer Correct ? | 64 Yes | 45 No |
Post New Answer View All Answers
how to calculate spacing rod in column
how to calculate rate analysys of 1:6 plastering 10 sq m
How much is the cover for slab?
why we use aggregate,sand with cement in concrete?
what is the Asfalt test?in road constraction..?
what is differences between ferrock and concrete ?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
what is shuttering co efficient?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
Define the various stages of the project planning process in construction.
What are the disadvantages while using stone dust as filler in pavements?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
how much cost of single coat 20mm thick plastering per sqre meter
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT