Answer Posted / abhijit
whenever load of the structure is very large and bearing capacity of soil is low pile is provided to get benefit of skin friction along with end bearing.It is common in costal area of india.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
how to calculate steel for slab or footings?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Explain the Strength of brick?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
Explain what is progress payment?
What is construction mitigation management?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How can you achieve soil enforcement?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required