Can anybody tell me application of PLC,DCS,SCADA.
Answer Posted / apoorva landge
And also DCS has a great storage capacity( memory) as compare to PLC and PLC has the best programming system.Therefore in most of the industries DCS and PLC is interfaced to get better results.. SCADA on the other hand is used when the control room is far away from the field. it is used to communicate at a long distance and on big scales
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
What is Positive Calibration and Negative Calibration?
why fuse block is not used for AI signal?
What are different types of cable?
Positioner usage.
How to convert mmWc(mili meter water colam) to tph(ton per hour)?
selection criteria of control valve? and selection criteria of actuator explain in brief?
model question paper of instrumentation for Jindal GET 2010.plz reply sudhanshukumar08@yahoo.com
can u briefly explain aboutan aryton shunt multirange DC ammeter?
Why thermo wells are used? What materials are used in thermo wells?
what step is taken for ESD ( emergency shut down) in DCS REPLY to hashimka20009@gmail.com
1. what is modbus cable? 2. what kind of communication we are using for the interface of DCS, ESD and Third party cabinets? 3. What is serial communication and peer to peer communication?
what is sil (safety integrity level
how to calibrate mass flow meter (Coriolis)? Example calibration range: 0 to 2500 kg/hr line size 3" fluid: Etheline glycol (MEG)
can anyone tell me about the basic concepts to consider before to start a PLC panel wiring
How process line mpm calculation is done?