What is the density of Cement, Fly ash,20 mm aggregate, 10
mm aggregate and stone dust?
Answer Posted / rupesh ranjan
Cement density is 1440 kg/cum
Fly ash is 750 kg/cum
20 mm Density is 1700 kg/cum
10 mm is 1600 kg/cum
Is This Answer Correct ? | 238 Yes | 34 No |
Post New Answer View All Answers
Types of column foundation and how to calculate its steel quantity.
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what is the ingredient value of 40mm and 20mm aggregates?
What things architect have to take care of before starting any project?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is the name of shuttering oil used in oman
How do you measure water flowing through 300mm diameter pipes?
plumbing CPVC fitting FTE Brass full form
What is the tensile strength of marble?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
Define Who designed the city of Washington DC?
rate analysis for cement pointing 1:4 , for 100 sq m
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)