If sechuduled backup through db13, but it is not triggered?
Answer Posted / radha krishna
check the action log in db13
check the brbackup log file from db13 calender.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the use of Trusted system? I know that there is no need of UID and PWD to communicate with partner system. In what situation it is good to go for Trusted system?
How to deactivate IPC in standalone CRM.
What is the difference between developer trace, system log and system trace?
At os level how you can change the number of work process? How you can analyze the status of work process at os level?
Mention the use of personalized tab and parameter tab in user master record?
How you can assign an object to 100 roles at time?
i want my company code and controlling area defaut as 'ABC" through out SAP what to do ? and my plantcode also default to some value
What is sap netweaver administrator tool?
what post steps and pre steps db refresh
What are the key responsibilities of sap basis administrator?
What is an “ok” code is and what is the difference between “t-code” and “ok” code?
What is the purpose of table tdevc?
1.how to retrive corrupt file in back up ? 2.what post actives of patching 3.how increase the file size in unix
Where XML file is generated in solution manager?
How to analysis abap dumps?