If sechuduled backup through db13, but it is not triggered?

Answer Posted / radha krishna

check the action log in db13
check the brbackup log file from db13 calender.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the use of Trusted system? I know that there is no need of UID and PWD to communicate with partner system. In what situation it is good to go for Trusted system?

885


How to deactivate IPC in standalone CRM.

2789


What is the difference between developer trace, system log and system trace?

985


At os level how you can change the number of work process? How you can analyze the status of work process at os level?

792


Mention the use of personalized tab and parameter tab in user master record?

969


How you can assign an object to 100 roles at time?

1175


i want my company code and controlling area defaut as 'ABC" through out SAP what to do ? and my plantcode also default to some value

1855


What is sap netweaver administrator tool?

874


what post steps and pre steps db refresh

2967


What are the key responsibilities of sap basis administrator?

884


What is an “ok” code is and what is the difference between “t-code” and “ok” code?

945


What is the purpose of table tdevc?

2321


1.how to retrive corrupt file in back up ? 2.what post actives of patching 3.how increase the file size in unix

1800


Where XML file is generated in solution manager?

1560


How to analysis abap dumps?

899