Manpower required for de shuttering of conccrete slab
Answer Posted / om prakash
manpower reuired for deshuttering of concrete
slab/column/beam. yes.
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
Can we use the flyash bricks in brick bat coba?
What is the l/d ratio of cantilever beam?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
Difference between pre-tensioning and post-tensioning.
Why is the statue of liberty made of copper?
what is the difference between prime coat and tack coat in road construction
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
What is the standard volume of pharma in cub ft
What are the steps involved in the concreting process?
how many spacers we need for 1 ton reinforcement? aprox.
what is tension footing?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
what is w/c ratio in dry lean concrete for m10 mix design
In reclamation works what are the importance of geotextiles and sand?