In Earth work compaction
How u calculate
How many liters of water required,for compaction of ordinary
soil for one Cu.m.
Answer Posted / hiren n. thakkar
Determination of Water to Be Added
If the moisture content of the soil is less
than optimum, the amount of water to be
added for efficient compaction is generally
computed in gallons per square yards. The
computation is based on the dry weight of soil
contained in a compacted layer. For example,
assume that the soil is to be placed in 6-inch,
compacted layers at a dry weight of 120 pcf.
The moisture content of the soil is determined
to be 5 percent while the OMC is 12 percent.
Assume that the strip to be compacted is 40
feet wide. Compute the amount of water that
must be added per 100-foot station to bring
the soi1 to optimum moisture. The following
formula applies:
{Desired Density (pcf)x W(desired)-W (actual)/100}x Vol.
(cu.ft)x 1gal./8.33lb
Substituting in the above formula from the
conditions given:
[120(pcf)x 12-5/100]x 100ft x 40ft x 0.5ft x 1gal/8.33lb
= 2017 gal/station.
If either drying conditions or rain conditions
exist at the time work is in progress, it may be
advisable to either add to or reduce this quantity
by up to 10 percent.
Substituting in the above formula from the
conditions given:
If either drying conditions or rain conditions
exist at the time work is in progress, it may be
advisable to either add to or reduce this quantity
by up to 10 percent.
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
Which brick is best for construction ,either fly ash or AAC BLOCKS
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
specifications of fe500 steel
How do you calculate reinforcement weight of steel?
What is .Dwg?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
How much quantity water should be placed in one cubic meter area?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is the Roll of Water Bonding under VDF road?
how to control PQI (Project Quality Index)
pls tell me , what is the water content
Define angular dimension?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
Describe the advantages and disadvantages of using plastic and timber fenders?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.