Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In Earth work compaction
How u calculate
How many liters of water required,for compaction of ordinary
soil for one Cu.m.

Answer Posted / hiren thakkar

For and e.g. Qty of earth work = 9,60,000 cum.
% OMC = 12.5
After soil test % OMC comes as per laboratory test = 8 to
9% ( say 8.9 %).

So OMC now =12.5 -8.9 = 3.6 % ( usually Depending on the
soil type, an in-situ moisture content deviating 2% to 4%
from the optimum moisture content as determined from the
Proctor test, may create impossible conditions to achieve
the required compaction).i.e 3.6 % is ok.

now Qty = 9,60,000 x 3.6/100 = 34560 cum or 34560000 lit
water required.

Now add evaporation losses @ 10%.

so now the exact vol of water required for compaction of
earth work is 3,80,16,000 lit.

Is This Answer Correct ?    31 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to conversation of all construction material in to brass

5570


how can we calculate steel value, depending on load

2389


What is meaning of FREE STANDING STAIRCASE ?

3088


how to calculate weight of 1.8 cum of aggregate

1770


1:4:8 pcc calculation 591 cu.ft

2355


What applicable rate of wct in bihar

1886


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1787


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2993


Explain different types of rcc pipes.

1212


I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,

2565


what is the method used for marking of cantilevers in hirise buildings by using theodolite

2988


Describe the role of independent Quantity surveyor?

2929


Define Who designed the city of Washington DC?

1157


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

2128


What is the tensile strength of wood?

1263