What is the time required to punch 1500 cards of 50 column
each at the rate of 10,000 punches per hour?
Answer Posted / guest
0.15hr
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Find the hypotenuse of a right angle isoceles triangle whose area is 50.
Himesh works thrice as much as Bhavin. Find the number of days it would take to complete the work if both work together if Himesh takes 60 days less than Bhavin to do a work.
What is the angle of degree suspended when two hands of clock showing the time 2.30.
6 people A,B,C,D,E and F sit around a table for dinner. Since A does not like C, he doesn't sit either opposite or beside C.B and F always like to sit opposite each other. If A is beside F then who is are the two neighbours of B?
There is a 14 digit credit card number in which every 3 consecutive digits add to 20. Here is a part of it.. Find the value of 'x'? _ _ _ 9 _ _ _ x _ _ _ 7 _ _
One skirt requires 3.75 yards of cloth. How many skirts you can make from 45 yards?
02: 1/3 of girls , 1/2 of boys go to canteen .What factor and total number of classmates go to canteen?
Radha,Geeta&Revathi went for a picnic.After a few days they forgot the date,day and month on which they went to picnic.Radha said that it was on Thursday,May 8 and Geeta said that it was Thursday May 10.Revathi said Friday Jun 8.Now one of them told all things wrongly,others one thing wrong and the last two things wrongly.If April 1st is tuesday what is the right day,date and month?
Find the next letter in the series c,o,m,p,u,t,e--
pick the odd one out bend shave chop whittle shear
(x-y/3)-(y-x/3)=?
A moves 3 kms east from his starting point . He then travels 5 kms north. From that point he moves 8 kms to the east.How far is A from his starting point?
A 4" cube is painted in all its faces and then it is cut down into 1" blocks. How many 1" blocks are there even without a single face being painted?
Please provide me rs aggarwal verbal reasoning book link pleeeeeeeez
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?