Answer Posted / mobashshar
you can speed up the read operation of reference hash file
link by pre loading the hash file in memory.
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
CHANGE CAPTURE
Terminate Activity
How many areas for files does datastage have?
what is the difference between == and eq in UNIX shell scripting?
Different ways a project can be moved to production ?...example ….export-import and Version control.
What is job control?
Describe link sort?
What is size of a transaction and an array means in a datastage?
What are routines in datastage?
how to run a sequential file stage in parallel if the stage is used on the TARGET side
What are the types of containers in datastage?
What are the steps needed to create a simple basic datastage job?
Lookup constraints
i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS
What is the difference between server job and parallel jobs?