A and B can do a piece of work in 72 days; B and C can do it
in 120 days; A dn C can do it in 4 days. Who among these
will take the least time if put to do it alone?
Answer Posted / soundar
Hello Kamal,Sunil I need explanation please
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
The equivalent compound ratio of 5:6::7:10::6:5
1/3 of girls , 1/2 of boys go to canteen. What factor and total number of classmates go to canteen.
A works thrice as much as B. If A takes 60 days less than B to do a work then find the number of days it would take to complete the work if both work together?
In 6 seconds a light flashes once. In one hour how many times it will flash?
A man travelled from the village to the post-office at the rate of 25 kmph and walked back at the rate of 4 kmph. If the whole journey took 5 hours 48 minutes, find the distance of the post-office from the village
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, Value of f(5)
Find the correct meaning of the following phrase: Man of few words
If substitution is as it's burnout. Didn't remember. But this is one.
Grass in lawn grows equally thick and in a uniform rate. It takes 24 days for 70 cows and 60 for 30 cows . How many cows can eat away the same in 96 days.?
A person runs 6 ft in 1/4 sec. how much it will run in 10 sec.
what is the angle between two hands of a clock when time is 8-30
Find the least value of 3x + 4y if x2y3 = 6.
Let's say that you have 25 horses, and you want to pick the fastest 3 horses out of those 25. In each race, only 5 horses can run at the same time because there are only 5 tracks. What is the minimum number of races required to find the 3 fastest horses without using a stopwatch?
i want questions asked in interview
A cylinder is 6 cms in diameter and 6 cms in height. If spheres of the same size are made from the material obtained, what is the diameter of each sphere?