Answer Posted / imran khan
For fluoroscent fixtures/lamps direct supply is not
provided so choke and startes comes into play.
Startes : as the name suggests works momentarily at the
starting time ..used to build up high voltage of about 800
to 1000 volts for ionising the gas in the lamp once gas is
ionised it disconnects from the ckt.
Choke : It is used to limit the current value as
fluoroscent fixtures r not direct feed from the supply.
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer
I completed my BE EEE degree 2006 .... which license should i apply .... ?????
Why only sinusoidal ac voltages are generated?why not triangular or sawtooth?
What are the factors which influence the choice of specific magnetic and electric loadings of a synchronous machine?
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
i need about 10 years of GATE solved papers in pdf format and even mock tests toooo
I need a formula to calculate the size of cable as per load but in the terms of length. Please Reply me as i search lot of sites but i did not get the answer.
what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)
What is step signal?
what is booster? and how it is connected in a circuit?
what is meant by brushed alternator & its working principle ?
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.
how is the connection of a 3 phase ct trivector meter done on a pole mounted transformer
Some times to change of DOR of a motor, interchange of R & B is not effected and RYB take same current, but interchange of R&Y is effected ie change the DOR. My doubt is what is the problem in motor and how it is happen.
i have 3500 amp load and select current transformer and perches.how i calculate .please understand