Answer Posted / satya pal
order in which cables are pulled n psc girder shall be explained.after casting of girder,after how many days and in which order cable shall be pulled.
regards
satya pal
| Is This Answer Correct ? | 11 Yes | 12 No |
Post New Answer View All Answers
how to calculate steel for slab or footings?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how much used soil in 1 brick of standard size?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
How to calculate the quantity of ingredients of M20 grade concrete?
What year was the keystone power plant in Indiana County constructed?
punj loyed and sapurjl palanjl
What is the substitute of Mastic Asphalt?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What is the crank length in the slab?