Answer Posted / satya pal
order in which cables are pulled n psc girder shall be explained.after casting of girder,after how many days and in which order cable shall be pulled.
regards
satya pal
Is This Answer Correct ? | 11 Yes | 12 No |
Post New Answer View All Answers
what is the theoritical percentage of concrete cubes testing per day?
What are the types of slump?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
which method is used in semi-rigid connection design??
Explain what is Critical Path Method (C.P.M)?
What is an object snap mode?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
how calucate cement sand ratio for plstering
What is the Null Point of chimney in Power Plant
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
"Gates of the dams are generally designed of curved shape". Why?
how to nfind out the specific gravity of sand.aggregate,water please help...
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
How to activate isometric axes in cad?
How to find CN by using arcgis 9.3?