Answer Posted / rsk
As IS code 1: 1 : 2
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate plastering for elevated water storage tank
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
how to calculate valuation for the old building?
what is the difference b/w full length and cutting length?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Consumption of Binding wire for fixing of cover block in vertical surface
List out the potential risk factors for workers on the construction site?
how to calculate spacing rod in column
Rate analysis of Vitrified tile in cement mortor 1:3
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
why +1 to be followed for calculating the no of bars in BBS. Please explain
How can I make justification between using concrete grade c35 compare c37?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
What are the different types of civil engineering?