concrete setting is a chemical reaction called hydration,for hydration the presence of water is required.after the placing and finishing of concrete the water will start to become dry because of hydration and evaporation due to atmospheric temperature ,so we need to pour water on the surface of concrete and to cover the concrete with some rug or plastic sheet to reduce the water loss. the process of keeping the concrete wet until it set is called curing..
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What is an object snap mode?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
What are the different types of foundation?
How to decide/consider the grade of bitumen for dbm.
on what basis the partial factor of safety are decided? form the load combinations
What are the applications of the modulus of elasticity?
types of laps in column
What applicable rate of wct in bihar
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
how to workable concrete cube test M-25 design mix
cement and sand required for one block of size 0.23*0.15*0.46
to draw bm diagrams for portal frames under different loadings//
What is the meaning of soil reinforcement?
What is the outturn of Ceiling plastering