What are 4 parameters between node A and node B, to bring a
PCM link up between them.
Answer Posted / sumit kumar
the four parameters between node A and node B, to bring a
PCM link up between them are
1.DPC(Destination Point Code) and OWNSP
2.Signaling Link set.
3.Network ID(NAT0 & NAT1)
4.PCM channel on which link is creating
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is non verbal communication?
what is the postec controllers and how it is work
What is the name of the occupational health and safety act in NSW
What is the role of a health and safety representative?
What is the role of health and safety committee
Hi friends,could sombody plz suggest me the website of History with audio (which can be hereable)plzzzzzzzzzzzzzzz help. Because i m going to appear WBSSC exam very soon its improtent.Plz send me to (mahato_hira@rediffmail.com)
What is optical character recognition?