what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
what is pouring and explain
all technical question
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Why reinforcement done in shorter span in two way slabs
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
what is high type road and low type roads
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What is the difference between engineering stress and true stress?
What is limit state method and working stress method and ultimate method
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
Rate analysis of Vitrified tile in cement mortor 1:3