Explain your project management?
Answer Posted / senthil kumar
project management is the joint responsibilty of 5 key personnel in a team.it includes 1 project manager,two exp engineers,1 quantity surveyars,i quality control.
| Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
how to compute slab reinforcements on step by step procedures??
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
procedure for preliminary selection of size of column of 5 storey building
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How much cement is require in one sqft area in a G+3 residential construction.
how to absorb to site basic corrections? which are the important correction?
What are the main reasons for conducting pull-out tests for soil nails?
Explain what is zoning permit?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
What are the different methods for drawing an arc?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
what is the productivity in aluminium shuttering per day
how many kg of 20mm, 10mm, dust available in one ton stone boulder