1/8 is devided by 's' , if 's' is incresed by 2 times, what
is the result.
Answer Posted / renu
1/8s
s increased by 2times means s+2s
=1/8(s+2s)
=1/24s
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Travelling for 9 days. total dist to be covered is 1080 miles. Dist covered per day must be 20 miles then that of previous day. what dist is covered
A certain type of mixture is prepared by mixing brand A at Rs.9 a kg. with brand B at Rs.4 a kg. If the mixture is worth Rs.7 a kg., how many kgs. brand A are needed to make 40kgs. of the mixture?
A building with height D shadow upto G. What is the height of a neighbouring building with a shadow of C feet.
The time showed by the clock at a moment is 8 am then the respective time of after and before 42896 hours is :
There are 150 weights .Some are 1 kg weights and some are 2 kg weights. The sum of the weights is 260.is the number of 1kg weights?
Certain no. of men can finish a piece of work in 10 days. If however there were 10 men less it will take 10 days more for the work to be finished. How many men were there originally.
Y catches 5 times more fishes than X. If total number of fishes caught by X and Y is 42, then number of fishes caught by X?
A boy has Rs 2. He wins or loses Re 1 at a time If he wins he gets Re 1 and if he loses the game he loses Re 1. He can loose only 5 times. He is out of the game if he earns Rs 5. Find the number of ways in which this is possible?
In a mixture, R is 2 parts and S is 1 part. In order to make S to 25% of the mixture, how much of R is to added?
Find the next letter in the series A,C,F,J,0--
Can you tender a one rupee note in such a manner that there shall be total 50 coins but none of them would be 2 paise coins.?
Himesh works thrice as much as Bhavin. Find the number of days it would take to complete the work if both work together if Himesh takes 60 days less than Bhavin to do a work.
Asian paints takes a contracts to paint 3 houses. Mr. White can paint a house in 6 days while Mr.Blue would take 8 days and Mr.Red 12 days. After 8 days Mr.White goes on a holiday and Mr. Blue begins to work for a period of 6 days. How many days will it take Mr.Red to complete the work?
The average of 4 consecutive even numbers is 27. What is the largest number?
I am writing the APSRTC OUT post.so i dont know the managerial aptitude.If any one know about this or refer any book, please give the information to my Mail id is narayanansg@gmail.com