Quick setting cement's setting time?
Answer Posted / siva
initial setting time of quick setting cement is 5 minutes... and final setting time of cement is 30 minutes
Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
Time required for curing of wall tiles before fixing
afe or not
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
why does the most of civil engg is not intersted to going for teaching field?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
During reclamation how can the occurrence of mud waves can be rectified?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is Gsb tollens ?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?