Where do u assign cost element in company code ?
Answer Posted / kolluru venkatesh
we can assign cost elements in FSOO and KAO1 also. Primary Cost elements can Create at FI and controlling level also. But secondary cost elements can create at controlling level only.
For Primary cost elements creation GL A/c is must
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Can both account based and costing based profitability analysis be configured at the same time? : co-pa
Explain about a shortened fiscal year?
please any body can tell me ,what reponsibilities and roles should a sap fico consultant do in the job
What is a quotation? : fi- accounts payable
What is an operating chart of accounts in sap ?
What is an asset transfer date? : fi- asset accounting
Explain ‘financial accounting (fi)’ in sap.
Why do we use sap fi?
What are the prerequisites in order to customize a document in sap?
What is a local currency and parallel currency?
Explain segments and cycles? : co- cost center accounting
How are scrap variances calculated?
Is it possible to change an existing b/s gl a/c to the p&l type? : fi- general ledger
What is a statistical key figure (skf)? : co- cost center accounting
Why it is necessary to block an asset master record? : fi- asset accounting