i am working in the automation company...i want to just know
how actully pid control valves are tune????...
Answer Posted / sumith
PID control valves works on 4-20 ma ,plc gives 4-20 ma to
pid valve according to the difference between setpoint and
actual value (for e.g s.p temp = 90 degc actual = 30
degc)now plc will give 20ma to pid valve for temp to reach
the setpoint.pid valve should have continous air supply.
to calibrate pid valve there is span and zero adjustment.
pid tuning is done in plc not in valve.pid tuning in plc is
trial and error type tuning.
we have to some values in P and I and D and check whether it
is reaching the setpoint smoothly
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.
what is the diffrence between pressure safety valve & pressure relief valve....pls
What is the difference bitween control net scaner and device net scaner
What is Droop? What is Step/Gradient Limiter in Turbine Governor control?
How will you calibrate PID controller? explain with example.
How servomotor controls throttle valve of TURBINE?
List three types Level Switches with their working principles
Dear Friends, we are planning to design Power distribution and Fiber optic in the same cabinet.Like Front side Fiber optic and Rear side Power distribution.Is it any possibility of problem occurs like interference etc? Your answer is highly appreciate.
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
what is actual drum level and compensated drum level?
Explain plc level and its type?
how to calculate the total flow in square root
What is stripper & spilitter ? Diffrence in this.?
what are the different types of Protocols? & their applications.
what is the electrical operation procedure for switching on 27.6MVA electric furnace.