Quick setting cement's setting time?
Answer Posted / nikhil chaudhary
5 minutes initial and 30 min final setting time
| Is This Answer Correct ? | 37 Yes | 17 No |
Post New Answer View All Answers
Explain the water bound macadam roag
WHAT IS YOUR EXPECTED SALARY?
how to control PQI (Project Quality Index)
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
what is relation between SPT N value and driving piles after conducting a soil test?
Define What is passive earth pressure ?
Specific gravity of cement?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
what pressure the NP2 class RCC pipe can sustain?
Explain how you can turn off the display for dimension in CAD?
specifications of fe500 steel
how to caluclate sienerge qty in construction in ap
What is difference between engineering stress and true stress?