the minimum percentage of steel for 2m rcc slab
Answer Posted / sitaraman
.12 for msd bar, .15hysd bar
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
Slab quantity
400 ku d/c clearess ketan hota hai?
how to preaper for interview wat they asked in interview give me idea
what is that one cub metre plaster in cemant and fine sand
Water filter calculation formula
what r you reqired for concrete baching plant?
what is civil engineer greatest strength and weakness?
what is detail procedure of eccentric footing? plz. give solved exmple?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
Wats the formula of eccentric footing and how was calculated from concrete qty
whats is difference between anchorage length and development length
why we are useing plastic under the lean concrete?and whts the advantage?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr