how to calculate quantity of steel & concrete in stair case
Answer Posted / saurabh kumar
first,we calculate length of waist by using pythagores rule
and this length multiply by width of waist and multiply by
thickness of waist slab.now for landing,length of landing
multiply by width of landing and multyply by thickness .we
add quantity of waist & landing which will be total
quantity of stair case
| Is This Answer Correct ? | 21 Yes | 8 No |
Post New Answer View All Answers
why does the most of civil engg is not intersted to going for teaching field?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
Cement consumption of one cubic meter of aerocon blocks masonry?
What things you need to take care of before building a kitchen island?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
I am called for interview from north east power plant .so, I need some interview question which may help me.
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
What Reinforcements Are Used In The Process Of Prestressing?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
What Are The Steps Involved In The Concreting Process, Explain?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Define the various stages of the project planning process in construction.