Answer Posted / k.prakashchandra
They are periodical checks.'A' may be daily and 'B' may be
weekly.The checks are specified by the manufacturers for
maintenance purpose.They may be called as maintenance schedule
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what will happen if synchronous machine rotor fed from single phase ac supply
can u give me a brief idea about power line carrier communication ??
define the non synchoronism of synchoronous machine in general g or m??
What will be the effect if I use inverter as UPS mood?
how we sesign the transformer give some specifion regarding design of transformers
physical identification of HT & LT panel
why do we use 25kv supply for traction purpose?
why servomotor motor? where i apply for best output?
two phases with neutral supply can be taken in 3C X 10 sq.mm cable .
What are steps to be taken while designing of DYN11 distribution transformer to achieve magnetising balance?
in 1-phase 230v,how in 3-phase 440v. in each phase in between 230v.
What is the difference between electrical earthing and electrical grounding?
how we can adjust for three phase motor cold stall time ,hot stall time and thermal register set up?
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly