how to calculate the required qantities of cement, Sand and
aggrigate to prepare 1 Cum of concrete mix 1:2:4
Answer Posted / vikas patil
For 1 Cu.m Concrete (1:2:4)
Cement =1.52/(1+2+4)=.217 Cu.m=.217/.035=6.2 Bags
Sand=(1.52*2)/7=0.434 Cu.m
Agg.=(1.52*4)/7=.86 Cu.m
out of 0.86Cu.m of Agg use following Proportion of Agg.
20mm Agg=0.65*.86=.56 Cu.m(65%of 0.86Cum)
&
10mm Agg=0.35*.86=0.3 Cu.m(35%of 0.86Cu.m)
Summary=>
Cement=6.2 Bags,
Sand=0.434 Cu.m,
20mm Agg=0.56Cu.m,
10mm Agg.=0.30Cu.m
Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
What is difference between combin footing & rapt footing
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
what is the types of surveying?which type of survey carrying for type of work?
How many mortar required for Brickwork of 1 Cu.m works??
What are the advantages and disadvantages of lead products in construction?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
procedure for preliminary selection of size of column of 5 storey building
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
How many bricks are there in 100cft?
How to calculate unit weight of concrete for m40 grade.
what could be the production cost of 1 cum of concrete by CP30 plant
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is the density of most of construction materials?