Answer Posted / mohammad azam azeem
The hot bitumen mastic is an intimate homogeneous mixture
of mineral filler and well graded fine and course(IF
REQUIRED) with a hard grade bitumen cooked and laid hot
trowelled and floated by mean of a wooden float.The mixture
settle to a coherent, voidless and impermeable solid mass
under normal temperature condition."
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is braced excavation all about?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
Tell me about triple point of water.
What is the Hardness of M-40 grade concrete, general and theoratical
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What are the strongest shapes in building?
residential buildings,mixing of concrete,structural,construction material,site handling.
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Why steel rods are produced only in even dimensions?
material used for mendrel use to bend epoxy coated rebar
pls tell me about method of cutting length of ties column
what are the code used for residental building?
what is directivity effect?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??