How to conduct the Hydro & Pnumatic test as per DIN & ASME
sTANDERS?
Answer Posted / ankur sahu
first create a loop in which pressure all over is constant .
then make all vent open to remove all air inside the loop
and blind the end of the loop with required thickness. then
filled water and maintain pressure 1.5 times of the design
pressure.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Will a steel cable become longer if it is heated while under load? Explain
What is the b check value of a 4bt engine
i am studying in bechanical engineering in M,S,University at Baroda.i and my friends want to take one month industrial trainning in mechanical engineering company.pleas send some company's name and procedure.
will I find the mechanical engineering interview question for asian paints?
can someone explain tolerances on bolts what the symbols mean
How much is 1 kn in kg?
What are the causes of damage to propellers?
What is the difference between "stress and strain”?
What ill be the shaft diameter with clearance having a bearing bore is 30mm?
where is the steam trap connected in boiler distribution?
what is electronically operated pneumatic valves? give one example
How to operate soot blower boiler and economizer?
I need BHEL Engineer Trainee written test papers in Mechanical stream.
What is the effect of friction on flow of steam through a nozzle ?
composition of cast iron fc-500,fc-550,& fc-260 which is use in sheet metal industries as a piller set