why do we need a 4th wire in 3phase 3wire transmission line
Answer Posted / sudhir singh
Fourth wire
needed in line
is of GI
provided for
earthing purpose
in case of any
fault occuring
in line we can
call it earth
conductor
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is difference between safe PLC and normal PLC
what happens to the water pump if ground water level is slowly decreasing?our water pump is varying from no-load full-load due to this problem
Why phase sequence must be same in any ht motor or generator circuit?if phase sequence doesn't same whatever will be affect on circuit?
The synchronous machine excitation system explain
What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA
I want to do a mini project. Now I'm studying in 6th semis tor EEE Engineering.
why does the magnetic balance tests at transformer?
what is earthing.how we make it,describe briefly.
Pls tell me whether we can use EN3A material for shafts of Permanent magnet alternator.What will be the effect of magnetic and nonmagnetic material for shafts on magnetic properties of PM rotor .
why electronic instruments is more favorable than electrical?
what is the meaning of number in (11, 31, 61,14, etc. CDG11, CDG31, CDG61, DDT32
we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.
how rectifier transformer work in electroststic precipetatore(esp?
How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.
Load break swicth maintenance procedure.