Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Am asked in interview that How are u going to write test
cases? I replied him that we refer to usecase diagrams and
the requirements documents to write test case. Did i replied
him anything wrong?

Answer Posted / swapnil lalit thakur

The following are some of the steps to consider:
1. Obtain requirements, functional design, and internal design specifications and other necessary documents
2. Obtain budget and schedule requirements
3. Determine project-related personnel and their responsibilities, reporting requirements, required standards and processes (such as release processes, change processes, etc.)
4. Identify application's higher-risk aspects, set priorities, and determine scope and limitations of tests
5. Determine test approaches and methods - unit, integration, functional, system, load, usability tests, etc.
6. Determine test environment requirements (hardware, software, communications, etc.)
7. Determine testware requirements (record/playback tools, coverage analyzers, test tracking, problem/bug tracking, etc.)
8. Determine test input data requirements
9. Identify tasks, those responsible for tasks, and labor requirements
10. Set schedule estimates, timelines, milestones
11. Determine input equivalence classes, boundary value analyses, error classes
12. Prepare test plan document and have needed reviews/approvals
13. Write test cases
14. Have needed reviews/inspections/approvals of test cases
15. Prepare test environment and testware, obtain needed user manuals/reference documents/configuration guides/installation guides, set up test tracking processes, set up logging and archiving processes, set up or obtain test input data
16. Obtain and install software releases
17. Perform tests
18. Evaluate and report results
19. Track problems/bugs and fixes
20. Retest as needed
21. Maintain and update test plans, test cases, test environment, and testware through life cycle

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in an online banking software,users are connecting to bankserver by login.This login module can take below inputs for user. a/c number prefix-3 digits but doesnot start with 0&1 a/c number sufix-6 digits number password-5to 10 chars alphanumerics in lowercase areacode-3 digits number but optional purpose- cheque deposit money trasfer mini statement bills pay After filling above fields,user can click submit button to connect to bank server.prepare test scenarios for online banking s/w login.

1956


Can you please explain me how to do testing of an E-insurance project end to end process..

2611


What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client

2548


HI FRNDS, I HAVE 2.5 years OF exp In Manual Testing,Plz let me know if thr r any oppurtunities in any company in Bangalore ID:dsnithi@gmail.com Thanks in Advance

2125


What is an entry criteria?

1112


What are the interview question on insurance domain in manual testing

19942


In usability testing we check spelling, content, look and feel, color combination, link or menu navigation? please let me know more about usability testing.

2016


How did you do unit testing in your project?

1125


Hi Friends, Can anubody give me brief overview of Automation tools.. (basics of tools-summary)of following tools? 1.Qualty Center 2.Load Runner 3.Win Runner 4.Q.T.P mail me on ...rachna.huda@gmail.com

2166


If anyone have attended interview with deloitte for the post of senior manual test engineer. Please share the interview process and the questions asked. How to prepare for the interview. Thanks in advance

4843


Q) Create Preffered customer: As a customer when i purchase more than $5000 in goods since my first purchase, I become a preffered customer so that i can receive the benefits associated with that status.

2521


What is the difference between SIT AND IST?

3157


Hi, Im B.E 2011 pasout,worked in back office till now, but now im searching for job into manual testing with fake exp of 1 year..Plz suggest me how to prepare for an intervw? how to gain real time testing knowledge? Is dere any site where i can practice testing?

2396


What is the negative testing and example

1526


approx how long a simple website take time just for manual testing including report generation.

2023