Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why the under of transformer platform is filled with rock stones.

Answer Posted / rajeshsan

There are many reasons for using gravel stones of 60mm size below transformer. Few are:-

1. During oil spillage from transformer or during sprinkler system act the water draining from soak pit it will be easier.

2. To avoid the grown of grass and entry of animals etc.,

3. To reduce the step potential

You can please refer the NFPA 850 for details.

Is This Answer Correct ?    14 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the different methods for the starting of a synchronous motor.

1175


Explain the difference between verilog task and verilog function?

1431


What will be the current if the resistance total in a series circuit doubles?

1287


What is the RME and explain the full form and what is the RME work?

2896


How to decide the size of the capacitor for a single phase induction motor say 2 HP ??

2316


What is the armature mmf in a D.C machine?

1292


How can we find out LT UG cable fault (size,from-4*25mm sqr to 4*300mm sqr)? How mani types UG cable faults?

3107


How maesure earth neutral value & how much maximum value value required in between earth & neutral.

2123


I have one ct of ratio 3000-2000/1 Amp its knee point voltage mentioned on name plate is 500-333/30mA-50mA at Vk/2. in secondary box there is three terminal named 1S1, 1S2, 1S3 then on which terminal obtained the knee point voltage ie 1S1-1S2 OR 1S1-1S3 & also specify the knee point voltage for the ratio 3000 from name plate.

2488


DESCRIBEPNEUMATIC SYSTM OF ASH HANDLING PLANT

5601


A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE

2639


what kind of technical test that i need to learn because i have an interview tomorrow.. please someone help me..

2072


what is the size of cable for 15kw motor and 85 meter cable length using with vfd

2430


sometime battery charged and then automatically charged when rectifier ON conition, is there any chances please clarify the same.

1944


Which is the largest hydropower station in the world?

1191