how many cubic ft. for 50 kg ( 1 bag ) cement?
Answer Posted / javed
1.25 cft
| Is This Answer Correct ? | 157 Yes | 40 No |
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
how to caluclate sienerge qty in construction in ap
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
In which code the the maximum height of concrete casting has been explained
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil