There is two transformers of 2MVA & 3MVA, which transformer
is located at the sending end & which is at receiving end.
why?
Answer Posted / manoranjan mishra
always higher rating TRF is installed at sending end &
lower rating is in receiving end because higher rating TRF
load capacity is more than lower rating TFR.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to flameproof electrical motor on the shaft?
what is the acceptable value of TAN DELTA and dissipation factor for 11kV, 1.75HP Motor?.
what is the main difference between power devices and signal devices
What will happen if the d.c. Shunt motor opened accidentally running on no-load has its shunt field winding?
how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.
How many kw will suply from one db
1.What is captive power plant? 2.What is national grid?Give brief idea.
i am venkat i got gre 930(verbal 270 quanta 660) and my toefl score 105..here question is why u got less score in gre ? what i supposed to tell...any chance of rejection is there...my accadamics record is very good
what is positive , negative & zero equivalent system resistance
In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?
what is servo motor and how it works?
In an ACB shunt trip coil and undervoltage coil operated normally( breaker open and charged). But closing coil not operating untill manually discharge and recharging. Any help.
What are the functions of different probes used in cro?
Why a tesa lamp is glow between two phase?
Can u tell me design of switch yard