who is perform user acceptance testing and when it will
conduct? is it before alpha testing or after alpha testing?
Please post the answer as soon as possible
Answer Posted / murali. ch
The Test Engineer Will Performs The U.A.T, He Will
Check The User Desirsd Areas in The Presence Of User.
inorder to Make him To Accept The application . It Will
Fall under Black box Testing
The U.A.T Will Conduct before The
Alpha Testing Because The alpha Testing was done by the
company in the Presence of user
| Is This Answer Correct ? | 2 Yes | 15 No |
Post New Answer View All Answers
Difference between adhoc testing and error guessing?
What r the sequences that leads to automation?
What types of software testing are available?
which of the following is not a coding defect? Option 1 Test harness defect Option 2 Data flow defect Option 3 Initialisation defect Option 4 Algorithmic defect
What is test plan and contents available in a test plan?
What are the types of maintenance?
hai friends can u expalin about real time process of testing at the company, like flow diagram
How much the bug is affecting the functionality of the application?
What is smoke test? Do you use any automation tool for smoke testing?
1) Test summary contains ? 2) Requirement Tracebility means ? 3) Test Effort contains ? 4) Test Planning Productivity ? 5) Metrics should be caluclated ? 6) Interest rate Rsik is a type ? 7) Test analysis and Design process task? 8) secured loan is a part of Liability (or) assest in a balance sheet? 9) Money Market means? 10) a ------ specifies all of the terms of a loan and the obligations borrower ? 11) what is a primary market is ? 12) Quality of Testing measure with ? 13) Company has a share with facevalue 10 rs/- and NAV of 37 after comapny has given Dividend of 35 % then How much NAV become ? ( I don't know what is NAV means, question overall Idea I am giving not 100% perfect ) the potions for these are 1) 33 2) 33.50 3) 37 4) 42 14) one compay has taken 10 million loan from a bank for a Interest rate is 10 % and base amount is 0.4% so how much they had paid monthly Emi ? they provideansews like 1) 100000 2) 114000 3) 140000 4) 104000 Remaing questions I not remember.
How do you Prepare a Defect Managemnt Policy
What is the Jar file?
What are the phases involved in software testing life cycle?
What does entry and exit criteria mean in a project?
Hi, this is not a tech question, i have 4 yrs of experience in Mainframe systems, presently as a mainframe tester in pune, i just want to step towards south locatios(preferable hyd), suggest me the best way to get calls from hyd.