If i have 200 test cases and we have to execute but we
don't have time to execute all testcases.within 1 hour we
have to execute that testcases and prepare the test
report.so how i have to resolve this problem? is there is
any technique in the testing.
Answer Posted / k.prakashchandra
Random selection.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How to see the inductance in a transmission lines
how can i apilly for electrical c licencese.sir,i completed B.Tech in electrical & electronics engineering in 201onot working any company
wat is the first thing dat is needed, 2 lay a cable in some area??
why does rotor rotets?
i want to apper for apgenco or aptransco or related can any one sugest me where can i get previous papers of thouse exams
What is accuracy of a measurement?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
application s to shunt coil
What is the difference between Encoder and Resolver?
What is the distance between each insulator in 33kv transformer and how can it calculate
How to calculate Grid rotor resistance(GRR) losses in slip ring induction motor?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.
why we can use 1 to 5V dc
What are the basic components of the feedback control system?