Answer Posted / shah rakesh g.
Tube is defined by its OD and Pipe is defined by NB(Nominal
bore)and thickness as schedule.
Tube OD is calculated in MM as (OD in inch * 25.4)but for
pipe upto 14" will not be calculated as (pipe NB * 25.4)
because upto 14" NB pipe the pipe OD will be higher than
calculated as (pipe NB * 25.4).Above 14" the pipe OD will
be calculated as (PIpe NB * 25.4)
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
what is the three types of combustion-control system?
Why the work per kg of air flow in axial flow compressor is less compared to centrifugal compressor for same pressure ratio ?
what is cyclon vibration effect in turbine
how can u calculate efficiency of one welder in piping work.if we give support staff for his work.
send me tech quesions please to 470.rajesh@gmail.com
please let me know the book for preparing to section engi and loco pilot bangalore
What is coefficient of contraction?
Explain different types of fits.
Explain the difference between projectile motion and rocket motion.
What resistance the ship encounter when the vessel is at sea
Why PWHT IS NOT DONE TO STAINLESS STEEL MATERIAL?
I need some information on EOT CRANES AVAILABILITY calculation and criteria.
which power station plants r more efficient? which is less? which is most expensive and which is cheapest?
why with the increase of pressure latent heat of steam decreases?
Explain what does green field project mean?