how must steel will use for 1 cubic meter.formula of steel
for beam,column,lantern.
Answer Posted / saif raza
Generally we are consider 100kgs steel per cum of concrete
for calculation which will give the rough quantity of steel
required for project.
Is This Answer Correct ? | 231 Yes | 51 No |
Post New Answer View All Answers
what r you reqired for concrete baching plant?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
what is m30 in concrete tiles
What is the coeffiencent Friction Angle between Steel and Ashphalt?
What is the procedure of concealed plumbing in toilets?
What is the purpose of Chipping in the heavy foundation?
what is education Cess.
Spider cracks occur in beam bottom due to––
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
will fix foundation bolts at site with out template is there any procedure?
What is need for setting limits?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
Civil engineering material testing Standard results
how to prepare site mix design