Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the meaning of STAR POINT? Why this important in CT and VT?

Answer Posted / krushna ch sahoo

the meeting point at which all the phase
terminals are neutralised called as star
point

Is This Answer Correct ?    18 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which type of questions well asked. ?

1691


when we have to use UPF wattmeter and LPF wattmeter? what is the difference between UPF and LPF wattmeter in terms of construction?

2491


Is there any standard guidelines/Criteria to design NGR/NGT.?

2835


why i can not use thimble on capacitor duty contactor

1343


How to do bus bar short circuit calculation for 230KV/11kv, 60 MVA Substation?

4716


Explain what is use of lockout relay in ht voltage?

1074


why ct's&pt'S out put called as burden,why compelsary short ckt the secondary of ct's while removing the burden?

2252


How many energy meters can be connected on a 15VA Voltage transformer. please send a calculation sheet.

1932


what is interpose? where it is used and why it is used?

1055


sir, iam a electrical engg graduate and i want to go in automation sector and for this i have decided to do industrial training for this,plz suggest me some good institute for the same in delhi,ncr. my degree percentage is 58%, can i get job after doing training, plz help....

2034


what purose of the double circuit transmission line phase of the line phase changed for circuit-1 for Circuit-2 R-Y-B B-Y-R

2276


why normally Generator rating are between 11Kv to 22Kv?

4650


what is cascade speed control device?and how this device control the speed of motors?

2145


Efficient electrical earthing in hard rock area

1558


how we decide the require size is this for a known current at fuu load?

1953