Answer Posted / b.praveen patnaik
The basic concept beyond using a capacitor in the ceiling
fans is that:
In the ceiling fans we use induction type motors which
requires a starting torque.so in order provide the starting
torque we use these capacitors.
dats it.
Thank u...
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to calculate slip ring induction motor stator and rotor currents??
What is the reason for using a GE G101 MCB in place of an EP102 MCB if both are capable of AC circuit protection?
hi I have done 3 yrs diploma in electrical engg after 10+2. I have 16 years of work experience into design proposals sales and engg application development in LV/MV swithcgear and sub station automation field. I want to apply for immigration to new zealand but I am not sure whether I qualify or not since I dont have a degree. Can anyone advice? Thanks Riz
what is ramping rate of generator
Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method
Difference between shunt, PMG and AREP excitation. Which is the most reliable between PMG and AREP.
What are the disadvantages of thermal power plant?
Which thing is maximum in RLC circuit at resonance a)power consumption b)inductive current c)capacitive voltage
How to calculate capacitor bank size at a load 800kVA.
when we have to purchase the transformer by own i.e how much load will preferred HT connection?
After synchronization with grid what is the demand value QKVAR and how we will maintain that?
Which contains in POLE ASSEMBLY of a 11KV Kirloskar-make SF6 (Model No-FP620A12)? Will u clarify with drawing?
what is the size of cable for 15kw motor and 85 meter cable length using with vfd
What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?