Answer Posted / gobinath r
Production Version:
Alternative Routing with alternative BOM selected upon the
lotsize for better production efficency.for example the
company may have different production methods for different
lot size produced.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
Can’t one material be assigned to more than one operation in a routine?
How is the processing time calculated in a wc when both labor, machine categories exist?
How to create object dependencies in a bom for a configurable material?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
Explain how ‘pp’ is ‘integrated’ with other modules?
What is mrp controller means?
Checkdigit example
What is a ‘routing’ in pp?
What is the planning time fence?
What is planning file entry
What general data appears on basic data screen?
Mention how mrp (material requirement planning) types are classified?
Explain Kanban.
What is 'mps' (master production scheduling)?