how many binding wire can be required for 1 metric tonne
steel?

Answer Posted / faisal

It is approximately 8 kg of Binding Wire required to bind
one Metric Ton of Steel...

Is This Answer Correct ?    22 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1638


Formula of area of crane hook

1527


natucher of concrete &type of concrete?

1902


how to calculate quantity of bricks in circular manhole with examples.

4999


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

1582






What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

1676


How to compute minimum number of columns required for a site from area of site?

1541


How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?

1563


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1911


what is the meaning of 40/20 src

5769


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4662


Explain what is change order request?

685


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1134


What out turn civil works

6358


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1950