Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between weir and a barrage

Answer Posted / rohit gupta

Weir is a uncontrolled storage structure....
barrage is a controlled storage structure having gates installed in it...

Is This Answer Correct ?    9 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can calculate cutting length of diamond ring

1846


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

2352


Can we use concrete of slump cone in cube casting in which we have already measured slump?

1781


what is the ingredient value of 40mm and 20mm aggregates?

2011


What is the l/d ratio of cantilever beam?

2005


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

2157


What are the phases inspections are done by local authority while construction?

1227


what is civil enginnering & what you need of this course?

2235


what is parametre for M25 after 7 days strength

2012


What is factor not to be taken in consideration in mix design?

3668


why demand factor less then 1 ?

2191


Civil engineering material testing Standard results

2355


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2236


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

2361


why are you joining in this (applied post) job and your aim for this job

2669