Answer Posted / ashish dubey
Slump is an arbitrary measure of workability.fresh concrete
filled in slump cone subsides when cone is taken up.this
subsidence of concrete measured and recorded as
slump.however same slump can be obtained for different
workability of concrete.day to day check on site.too high
and too low slump gives immediate warning.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
What are the advantages and disadvantages of using plastic and timber fenders?
pls tell me about method of cutting length of ties column
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
How you can use different dimension tools in cad? What are the different dimensions available?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
I need model question papers for writing the Dubai municipality exam,for G+1
In cement making,what is meaning of blend,fineness,density.
what do you understand by M25 concrete
How to calculate canal slope curvature qty!
What is the use of offset command?
What is an ortho mode?
what is the weight of 6000 psi concrete in lb/cft?
why are you joining in this (applied post) job and your aim for this job
how to calculate MR 9(derivation)