Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are types of mixs ?

Answer Posted / shila

Design mix is that which is achieved by mixing different
quantities of aggregates and binder (Cement) by trial and
error to get the desired compressive strength for say M15.
M15 concrete may not be necessarily 1:2:4 for different
varieties of aggregates.

Nominal mix is the standardized mix achieved by designing
which can be used without further designing in the
prescribed ratios like 1:2:4 or 1:1.5:3. These are never
denoted as M15 or M20

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

2369


How to calculate unit weight of concrete for m40 grade.

4060


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

2108


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

18319


Explain what is progress payment?

1214


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2695


What expenses counted in contingencies and how much it is in related to built-up area of the building.

1829


How and where are aqueducts built?

1252


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

1187


How is the strength of cement measured?

1227


What is reinforced concrete?

1168


why demand factor less then 1 ?

2242


Define What is the origin of name Railway Sleepers?

1332


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2147


How to calculate the load of partion in flat slab if we use brick?

1877