why the generating voltage in India is 11kV or why is it be
transmitted as multiples of 11
Answer Posted / nikhil s
if we transfer the generation from single phase to three
phase we can increase the generated power by 50% for the
same machine ,the value of voltage for achieving this 50%
increased power is 11kv rms
if my answer is wrong plz contact me ' nikhilgdas@gmail.com
'
b'coz i want to know more about this
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Dear Sir/Madam, I have one questions we have three steam turbines and one Gas turbine and our industry linked with the public network, we have protection system one of the protection is reverse power we can export just four MW only i would like to ask about how to calculate the reverse power. Thank you in advance best regards
Why power genaration in India is at 50HZ while America its 60HZ
Why do we avoid electrical conduits in floors at apartments?
new 90kw motor installed so how I purchased cable ,fuse,etc please give me technic for cable selected why always capacitor delta connection
The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?
A 1F capacitor is charged to 100V initially. A 1H inductor is connected accros the capacitor througha a switch. The current in the circiut when the switch is closed is____
please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5
why we use 630mm single core cable for transformer secondary side and why two neutral cable
what is ground fault in ACB?
if a number of plc s are there then how many modbus to be used
What is the instrument to check the rotating diode fuse of alternator in running conditions?
What would cause a 240v choke that should give 110v out on a 16w lamp to gradually increase to 160v?
Which contains in POLE ASSEMBLY of a 11KV Kirloskar-make SF6 (Model No-FP620A12)? Will u clarify with drawing?
how you will decide the distance between the power transformer and its fencing
What is the implications when 600 hp motor is started when the unit is running with Transformer of capacity 1500 KVA and DG set of 1000kva