In start of selection, if we perform validation, what
happens ?
Answer Posted / lakshmi
validation to check out for valid inputs is usually done
under at selection-screen event. when we are doing it in
start-of-selection, its better to use information msgs
rather than error msgs as dese do not allow the users to
navigate to the previous screen to make necessary input changes.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is a data dictionary? : sap abap data dictionary
Explain the advantages of abap query tool?
What are null values? : abap data dictionary
Of the two call transaction and session method, which is faster?
Can we write the code both call transaction and session method in single program?
What are the differences between macro and subroutine?
What is an “on input filed” statements?
What are the different buffering methods?
HOW TO TRANSFER VENDOR MASTER DATA FROM LEGACY SYSTEM TO SAP SYSTEM THRU LSMW (IN LSMW, USING DIRECT INPUT PROGRAM:RFBIKR00)
What are the different types joins?
What are the advantages of logical databases?
What is tcode se16? For what is it used.
What are the 3 methods that we use in sequence in a batch input session method? : abap bdc
Write the bdc table structure? : abap bdc
What is the function of the transport system and workbench organiser?