Answer Posted / k.prakashchandra
The front portion of the panel consisting of meters is
called the panel board.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how rectifier transformer work in electroststic precipetatore(esp?
what is the difference between elcb and rccb ?
explain supply side and demand side energy management with advantages & disadvantages
Hi everyone, I'm Lachuu, recently joined automation company as PLC Engineer. I have certain basic question, I request all big gurus and seniors to answer these question. Because this will be very helpful to me as well starters like me. How to design a control circuit (ex: pick & place - my current project) Yamaha robot PxYx series controller RCX222, using 6 cylinder double acting, plc keyence kv p16r 2 expansion unit for input and output each. How to select panel terminal mcb elcb powersupply. My main concern in some projects how to select dc power supply, mcb rcb(I came across dif bt b c d curves, but stil confusing, pls help me :-(. I would really appreciate all who are going respond to this question.
difference between crane drive and line drive.
how to calculate the fault in substation
explain types of electric welding and its applications
what is the acceptable value of TAN DELTA and dissipation factor for 11kV, 1.75HP Motor?.
Installation resistance for whole installation of 16 kva & 25 KVA DTRA a) Between each conductor b) between conductor to earth c) installation resistance for each apparatus, each conductor to earth d) earth resistance for the system of earthing
Give some differences between open loop and closed loop control systems.
what are the stresses in circuit breakers ?
why we are not giving the zone 1 trip command to the master trip relay
advantages and disadvantages of inverse definite minimum time RELAY
with out colour codeing on conductor how can be find what is r,what is b,what is y phases.....
what are carbondioxide and dcp used in fire extinguishers